Plinth-Ready Built-to-Suit Industrial Facility with FM2 Flooring & 3-Phase Power, Targeting June 2026 Delivery

Plinth-Ready Built-to-Suit Industrial Facility with FM2 Flooring & 3-Phase Power, Targeting June 2026 Delivery

 PROJECT OVERVIEW

Micro-Market: Industrial zone (micro-market specific)

Project Type: Built-to-Suit Industrial / Warehouse Facility

Total Area: ~110,000 sq.ft

Current Status: Plinth & foundation completed

Structure: Ground-floor PEB shed

Development Approach: Tenant-specific design, engineering, and execution

This project is structured as a true BTS development, allowing the superstructure and internal specifications to be executed strictly as per the occupier’s operational, load, and compliance requirements.

 WHY PLINTH-READY MATTERS

A completed plinth materially improves execution certainty:

Reduced construction timelines compared to greenfield BTS

Faster operational readiness for expansion-driven occupiers

Lower civil and approval-stage risk

Design flexibility retained for final flooring, height, and utility loads

This approach bridges the gap between speculative ready stock and fully greenfield BTS.

DEVELOPMENT & CUSTOMIZATION SCOPE

The facility supports customization aligned with industrial and manufacturing SOPs:

Clear height: ~40 ft (high-bay storage / manufacturing compatible)

Docking: 10 dedicated loading docks

Flooring: FM2-grade industrial flooring suitable for heavy-duty operations

Power: 3-phase electrical power provision (load finalization post tenant brief)

Fire & safety: Fire hydrant and sprinkler system framework

Thermal efficiency: Roof and wall insulation planned

Internal layout: Column grid, bays, and circulation configurable

All technical parameters will be locked after tenant technical sign-off.

 OPERATIONAL & INFRASTRUCTURE READINESS

Vehicle movement: Designed for efficient truck and container circulation

Power infrastructure: 3-phase power planning integrated at design stage

Fire compliance: Hydrant + sprinkler system aligned with industrial norms

Drainage & utilities: Planned during execution to avoid retrofits

Use-case suitability: Self-use industrial and manufacturing operations

Early-stage infrastructure planning ensures smooth commissioning post-handover.

 IDEAL OCCUPANT PROFILE

Best suited for:

Manufacturing units (self-use facilities)

Industrial occupiers with heavy equipment or racking loads

Companies requiring FM2 flooring and high power reliability

Long-term users prioritizing operational stability and compliance

Ideal for occupiers with defined SOPs, equipment layouts, and expansion timelines.

 COMMERCIAL FRAMEWORK 

Indicative Value Reference: ₹3,000 per sq.ft

Structure: Built-to-Suit execution with long-term occupancy logic

Possession Target: June 2026

Handover: Bare-shell or tenant-specific specifications, as agreed

Commercial terms are finalized post technical and design alignment.

 RISK & DUE-DILIGENCE NOTES

Already completed:

Plinth & foundation

Site readiness

To be finalized post tenant finalization:

Final power load sanction

Flooring specifications confirmation

Superstructure engineering & statutory approvals

Key checkpoints:

DISCLAIMER : “Authorised Channel Partner. Image for representative purposes only. All areas, prices and details are approximate and subject to change without prior notice. Terms and conditions apply.”

Official Contact 
📞 7709201613
📧 warehouseinvestment1@gmail.com 

#WarehouseInvestment
#IndustrialRealEstate
#PreLeasedWarehouse
#InvestorMindset
#LogisticsRealEstate
#IndustrialAssets
#AjmeriaRealtor

Popular posts from this blog

MMRDA APPROVED RCC STRUCTURE WAREHOUSE SPACE AVAILABLE AT GOPALA INDUSTRIAL PARK IN BHIWANDI

MMRDA APPROVED AYUSH INDUSTRIAL AND LOGISTICS PARK LOCATION WALSHID BHIWANDI

SHIV SHANTI INDUSTRIAL AND LOGISTICS PARK LOCATION SONALE BHIWANDI